Brf Vega Garden – A Successful collaboration from start to finish
Brf Vega Garden is a newly completed residential development in Stockholm where quality and sustainability have been prioritised from the very first groundwork to the final handover. Through close collaboration and a proactive approach, Sustera Inspection ensured that the project was delivered to the highest standard.
Contents
The project, commissioned by OBOS Kärnhem, comprises modern homes designed with long‑term quality and environmental responsibility in mind. Today, the development is fully completed, occupied, and handed over to satisfied residents.
More information about the project is available on the OBOS website.
Our role
Sustera Inspection held a comprehensive responsibility throughout the project. We acted both as the appointed Control Manager (KA) and as the inspection provider. This dual role gave us a unique opportunity to follow the project from start to finish and ensure that every stage of the construction process met the required regulations and quality standards.
Running from 2022 to 2025, the project benefited from our early identification of potential issues, giving the client the best possible conditions to deliver a final result of exceptional quality.
The team behind the work
Several members of our team contributed their expertise to the project:
Johan Höglund (KA), Kenneth Ek (Inspector), Avat Andimeh, Erik Nyström, Mikael Harrysson, Erik Palmer, Åke Wihlborg, Patrik Johansen, Roger Ingebo, Mattias Hellmark, Johan Erngren, Jonas Karlsson – each playing an important role in inspections and follow‑up throughout the process.
The client
The project was initiated by Mikael Timmas at OBOS Kärnhem and completed under the leadership of Mattias Thörnblom, who successfully guided it to the finish line.
For further information about the project:
- Mikael Timmas
- Mattias Thörnblom
The outcome
By combining the KA role with the inspection assignment, we were able to maintain a complete overview and act proactively throughout the construction phase.
This allowed us to:
- Identify issues early and minimise risks
- Contribute to a smoother handover and a higher‑quality final product
The project presented its share of challenges, but thanks to strong teamwork and close cooperation, the result is one we are proud to stand behind.