Located close to the sea, Asunto Oy Helsinki Perttulantie 4 is exposed to harsh weather conditions. The building’s new translucent rendered façade stays cleaner for longer thanks to a self-cleaning nano-micro product.
Contents
The entire project under one roof
The façade of Asunto Oy Helsinki Perttulantie 4, situated in Helsinki’s Lauttasaari district, was in need of renovation. Sustera managed the façade refurbishment from start to finish, carrying out the condition survey, design, procurement and tendering of contractors, as well as site supervision throughout the project. Sustera is also responsible for the two-year warranty period, including all related inspections.
“Thanks to the condition survey, we were able to identify the right solutions from the very beginning. Red lichen and algae had accumulated on the upper sections of the existing translucent render. We removed the old render while retaining the building’s original appearance,” says Pasi Kupiainen, Business Director.
No damage extending through the bricks was found, meaning that only around ten bricks needed to be replaced.
“There were cracks in the brick surface, but the bricks themselves were not deteriorated or cracked through,” says Petri Manninen, Project Manager and Site Supervisor.
Renewal of the façade sealant joints
The actual façade refurbishment took approximately three and a half months, running from May to August. The project also included the renewal of the façade sealant joints, which were approaching the end of their technical service life.
“The average service life of an elastic sealant joint is around 15 years. The building was completed in 2007. The old translucent render was also removed by sandblasting, a method that inevitably causes some damage to the façade joints. It therefore made perfect sense to replace the joints at the same time,” Manninen explains.
The project also addressed deficiencies identified in the building’s original flashings.
“There had been no water ingress caused by the sealant joints or flashings. However, without corrective measures, such issues could well have emerged over time,” Manninen says.
A challenging location
The building’s surroundings brought their own challenges to the project. The roof of a neighbouring property extended right up to the wall undergoing refurbishment, requiring the contractor to erect scaffolding via the neighbouring roof. Nevertheless, logistics and site access arrangements were managed effectively throughout the project.
Another challenge was the building’s exposure to the elements. Located close to the sea and standing among the tallest buildings in its immediate surroundings, Perttulantie 4 faces significant weather exposure. The area is also characterised by abundant vegetation, meaning that wind and rain can easily encourage the build-up of algae and other biological growth on the façade surfaces. For this reason, the façade render was specified based on a carefully designed rendering solution.
“The location presents a demanding environment. If unsuitable materials were selected, the façade would quickly become dirty, resulting in more frequent cleaning and maintenance. During the design phase, careful consideration was given to selecting the right products and solutions to extend the façade’s service life and help keep the façade surface clean. We used a self-cleaning nano-micro coating within the rendering system,” Manninen explains.
The nano-micro coating helps the façade retain its value in the prestigious surroundings of Lauttasaari.
“Had a different solution been chosen, the same issues would have reappeared within two or three years. The façade would have started to show reddish discolouration, red lichen or other biological growth,” Manninen continues.
Smooth collaboration throughout
Both Kupiainen and Manninen highlight the seamless collaboration as one of the project’s key strengths. Because the entire process was managed within Sustera, information flowed smoothly between project phases and disciplines. For example, the client avoided delays associated with waiting for separate expert assessments.
They also praise the straightforward and transparent cooperation with the housing company and the contractor, Concrete Urakointi. Throughout the project, the housing company’s board was represented by its Chair, Olli Nummela, which contributed to efficient decision-making.
“Cooperation with both the designer and the site supervisor was excellent. In my view, the supervisor handled the role exceptionally well in dealings with both the housing company and the contractor. He was always available when needed and resolved any practical issues immediately,” says Nummela.
Sustera had previously carried out the building’s condition assessment as part of the pre-inspection for the one-year warranty inspection in 2009. In 2024, Sustera also completed a detailed condition survey, together with moisture and energy-efficiency surveys.
“We have been involved with the building since its earliest days, including the first warranty inspections,” Kupiainen concludes.